Sign In | Join Free | My himfr.com
Home > Polyurethane Running Track >

Full Pour IAAF 400m Standard Track Surface PU Rubber Playground Use

    Buy cheap Full Pour IAAF 400m Standard Track Surface PU Rubber Playground Use from wholesalers
     
    Buy cheap Full Pour IAAF 400m Standard Track Surface PU Rubber Playground Use from wholesalers
    • Buy cheap Full Pour IAAF 400m Standard Track Surface PU Rubber Playground Use from wholesalers
    • Buy cheap Full Pour IAAF 400m Standard Track Surface PU Rubber Playground Use from wholesalers
    • Buy cheap Full Pour IAAF 400m Standard Track Surface PU Rubber Playground Use from wholesalers

    Full Pour IAAF 400m Standard Track Surface PU Rubber Playground Use

    Ask Lasest Price
    Brand Name : USAWEGI
    Model Number : AR-SP-02
    Price : negotiate
    Payment Terms : L/C,D/A,D/P,T/T,Western Union,MoneyGram
    Supply Ability : 20000 Square Meter Per Week
    Delivery Time : 7 work days
    • Product Details
    • Company Profile

    Full Pour IAAF 400m Standard Track Surface PU Rubber Playground Use

    Economical Full Pour Pu Runway School Sports Playground


    Physical properties data

    Serial number
    Test project
    Standard
    requirements
    CN-S05FCN-S05TCN-S05HCN-S05ZJudge
    1
    Shock absorption rate,%
    30-5038.939.239.340.1Qualified
    2Vertical deformation,mm0.6-2.51.742.022.402.4Qualified
    3
    Anti-slide value,BPN20℃≥
    4757575657Qualified

    4

    Tensile strength,Mpa ≥0.5/0.4 permeable type0.80.40.620.51Qualified
    5Tensile elongation,% ≥4076.74654.352.8Qualified
    6Flame retardant level/////Qualified
    7Thickness,mmQualified

    Details Reflect Quality

    1. Good impact resistance and elasticity, with a strong elastic layer and buffer layer, which can absorb strong impact and the surface is not easy to be damaged
    2. Anti-slip treatment, the particles have been treated with anti-slip treatment, and can be used indoors and outdoors all-weather without being affected by climate conditions
    3. No seams, strong adhesion, strong integrity of the site, no seams, beautiful colors. The same material as polyurethane glue, similar compatibility, strong bonding
    4. Manufacturer's source of goods, manufacturer's supply, can be customized according to needs, a variety of specifications are available, sufficient supply, reliable quality

    Products Description
    1. otal system thickness approx.
    9-18mm (we recommend 13mm).
    Hard-wearing, long-lasting.
    Suitable for all-weather and all-season use, with good anti-slip performance.
    2. Environmental Tartan Track, non-toxic and harmless.
    With strong elastic layer and buffer layer, strong impact absorption and high wear resistance coefficient.
    Can handle constant toughest stresses by spikes.
    3. High-quality innovative PU elastic material, high adhesion to the foundation, high cohesive strength, good toughness, mixed with environmentally friendly EPDM colored particles.
    It meets IAAF standards and can be used in professional competition venues.

    Quality requirements for runway foundation


    Plastic runway construction is based on asphalt or cement, and the basic practice is roughly the same as road construction. The foundation surface requires good flatness, so as to ensure the consistency of the thickness of the plastic surface layer. The quality requirements for the plastic runway foundation are as follows.


    (1) Slope: transverse < 1% (curve 8%, straight 5%, semi-circle 5%), longitudinal < 1%, jump area less than 0.4%, the surface should be smooth, smooth drainage.


    (2) flatness: flatness qualified rate of more than 95%, 3 meters straightedge measurement error is not more than 3㎜


    (3) Positioning: In order to accurately construct and draw lines, the four semi-circular tangents and two circular centers of the runway site should be firmly and distinctly marked.


    (4) Drainage: The drainage system must remove water two hours after a heavy rain. In frozen areas, it is better to add a buffer layer of geotextile between asphalt layer and gravel layer. Special waterproofing should be done along the foundation of the drain trench.


    (5) Strength and stability: the foundation should have a certain strength and stability, the surface is uniform and solid, smooth without cracks, no rotten edge pile squeezing, no pockmarked surface, smooth joints without obvious height difference. The cushion is compacted with a density of more than 95%. After being pressed by a medium roller, there are no significant tire marks and loose float soil.

    Full Pour Athletic Track Construction Steps
    We can arrange workers to go to the site for construction guidance.
    If you are interested, you can contact us now.
    Authority Testing Quality and safety
    Project cases
    Full Pour IAAF 400m Standard Track Surface PU Rubber Playground Use
    Full Pour IAAF 400m Standard Track Surface PU Rubber Playground Use
    Full Pour IAAF 400m Standard Track Surface PU Rubber Playground Use
    Quality Full Pour IAAF 400m Standard Track Surface PU Rubber Playground Use for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: USA WEGI SPORTS INDUSTRY INC
    *Subject:
    *Message:
    Characters Remaining: (0/3000)