Sign In | Join Free | My himfr.com
Home > Polyurethane Running Track >

Ultraviolet Proof IAAF Track Field , Full PU Running Track Floor Material

    Buy cheap Ultraviolet Proof IAAF Track Field , Full PU Running Track Floor Material from wholesalers
     
    Buy cheap Ultraviolet Proof IAAF Track Field , Full PU Running Track Floor Material from wholesalers
    • Buy cheap Ultraviolet Proof IAAF Track Field , Full PU Running Track Floor Material from wholesalers
    • Buy cheap Ultraviolet Proof IAAF Track Field , Full PU Running Track Floor Material from wholesalers
    • Buy cheap Ultraviolet Proof IAAF Track Field , Full PU Running Track Floor Material from wholesalers

    Ultraviolet Proof IAAF Track Field , Full PU Running Track Floor Material

    Ask Lasest Price
    Brand Name : USAWEGI
    Model Number : AR-SP-02
    Price : negotiate
    Payment Terms : L/C,D/A,D/P,T/T,Western Union,MoneyGram
    Supply Ability : 20000 Square Meter Per Week
    Delivery Time : 7 work days
    • Product Details
    • Company Profile

    Ultraviolet Proof IAAF Track Field , Full PU Running Track Floor Material

    Ultraviolet Proof 13mm Full Pour System Running Track Rubber Athletic Track For Gym

    Technical Data

    Product Name
    Full Pur Athletic Track
    Material
    EPDM granules + PU Binder
    Color
    Customized, Red, Blue
    Thickness:
    9-15mm (recommend 13mm) or customized
    Application
    School, communities, stadium, training center
    Special Conquest
    Non-poisonous, harmless and odorless
    Foundation/Base
    Cement or asphalt
    Free Sample
    Available
    Packaging Details
    Liquid systems by using 25-300kg per steel barrel with wooden pallet reinforcement.
    Delivery Detail
    shipped in ten days after paid

    Running Track type

    Plastic typeAdvantageShortcomingSurface type
    Breathable plastic runwayLow cost, breathable and water seepage, acid and alkali resistance.
    Black particle base buffer layer, TPE or other environmentally friendly miscellaneous material base buffer layer, EPDM
    The base layer has low requirements and moderate elasticity
    The slip resistance is worse than the mixed type. Short service life of 1-3 yearsThe rubber content exceeds 13% as the base buffer layer, and the spray surface uses EPDM with a content of 20%
    Hybrid Plastic runawayEnvironmental protection physics are up to standard,
    Service life 5-8 years
    The thickness is unstable, the material is easy to foam unevenly,
    The volatilization period of TVOC is 6 months, and the plasticizer is easy to exceed the standard
    Spray particle type, sprinkle particle type, self-knotting type
    All-plastic plastic runwayEnvironmental protection physics are up to standard, after wear and tear
    Good remodelability, service life 8-10 years
    The thickness is unstable, the material is easy to foam unevenly,
    The volatilization period of TVOC is 6 months, and the plasticizer is easy to exceed the standard
    Spray particle type, sprinkle particle type, self-knotting type
    Prefabricated plastic runwayGood surface effect, environmental protection and odorless,
    Good elasticity, service life 8-10 years
    High requirements on the foundation, splicing gaps
    Easy to crack and warp, production batch color difference
    Chemical bottom composite coil, ordinary rubber composite coil,
    Homogeneous transparent coil
    Sandwich runwayGood cushioning, environmentally friendly and odorless,
    No cracks, service life 8-10 years
    The cost is high, and the requirements for the flatness of the foundation are highPU foam coil buffer layer, TPU mixed EPDM buffer layer,
    TPU semi-prefabricated buffer layer

    Advantages of Full PU Running Track

    1. All weather suitable: there is no condition to weather and temperature ranged, it still can devote to use after heavy rain.
    2. High flexible, cushion and shock absorb: due to Multi-layer system and Rubber granules, the flooring was soft and flexible, which can do an favor for athletes' performance and prevent from injury at the same time.
    3. Anti-nail: it won't destroy by the spikes or start running frame even at the starting point of 100-meter.
    4. Flatness: special machine for installation, you can adjust the machine make the thickness correspond to clients required.
    5. Weather resistance: it won't fade,pulverized or intenerated by ultraviolet radiation, Ozone and the pollution of acid rain, which can keep the fresh color for a long time.
    6. Pressing: it can rebound after the heavy equipment.
    7. Viscosity: special construction disposal , it ahs the strong Viscosity, which can prevent the ascend of water, no pickle,separating, etc.


    Full PU Running Track Introduction


    A full PU (polyurethane) running track is a type of synthetic running surface that is commonly used in athletics tracks, both indoor and outdoor. The track consists of multiple layers, with the top layer being made of a polyurethane material that is applied in liquid form and then hardened into a durable and resilient surface.


    Products Description
    1. Total system thickness approx.
    9-18mm (we recommend 13mm).
    Hard-wearing, long-lasting.
    Suitable for all-weather and all-season use, with good anti-slip performance.
    2. Environmental Tartan Track, non-toxic and harmless.
    With strong elastic layer and buffer layer, strong impact absorption and high wear resistance coefficient.
    Can handle constant toughest stresses by spikes.
    3. High-quality innovative PU elastic material, high adhesion to the foundation, high cohesive strength, good toughness, mixed with environmentally friendly EPDM colored particles.
    It meets IAAF standards and can be used in professional competition venues.

    Quality requirements for runway foundation


    Plastic runway construction is based on asphalt or cement, and the basic practice is roughly the same as road construction. The foundation surface requires good flatness, so as to ensure the consistency of the thickness of the plastic surface layer. The quality requirements for the plastic runway foundation are as follows.


    (1) Slope: transverse < 1% (curve 8%, straight 5%, semi-circle 5%), longitudinal < 1%, jump area less than 0.4%, the surface should be smooth, smooth drainage.


    (2) flatness: flatness qualified rate of more than 95%, 3 meters straightedge measurement error is not more than 3㎜


    (3) Positioning: In order to accurately construct and draw lines, the four semi-circular tangents and two circular centers of the runway site should be firmly and distinctly marked.


    (4) Drainage: The drainage system must remove water two hours after a heavy rain. In frozen areas, it is better to add a buffer layer of geotextile between asphalt layer and gravel layer. Special waterproofing should be done along the foundation of the drain trench.


    (5) Strength and stability: the foundation should have a certain strength and stability, the surface is uniform and solid, smooth without cracks, no rotten edge pile squeezing, no pockmarked surface, smooth joints without obvious height difference. The cushion is compacted with a density of more than 95%. After being pressed by a medium roller, there are no significant tire marks and loose float soil.

    Full Pour Athletic Track Construction Steps
    We can arrange workers to go to the site for construction guidance.
    If you are interested, you can contact us now.
    Related Certificates
    Project case
    Ultraviolet Proof IAAF Track Field , Full PU Running Track Floor Material
    Ultraviolet Proof IAAF Track Field , Full PU Running Track Floor Material
    Ultraviolet Proof IAAF Track Field , Full PU Running Track Floor Material
    Quality Ultraviolet Proof IAAF Track Field , Full PU Running Track Floor Material for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: USA WEGI SPORTS INDUSTRY INC
    *Subject:
    *Message:
    Characters Remaining: (0/3000)