Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | USAWEGI |
Model Number : | AR-SP-02 |
Price : | negotiate |
Payment Terms : | L/C,D/A,D/P,T/T,Western Union,MoneyGram |
Supply Ability : | 20000 Square Meter Per Week |
Delivery Time : | 7 work days |
IAAF Athletics Track High Quality Full Pu Running Track For School And Competition
Product Name | Full Pur Athletic Track | |||
Material | EPDM granules + PU Binder | |||
Color | Customized, Red, Blue | |||
Thickness: | 9-15mm (recommend 13mm) or customized | |||
Application | School, communities, stadium, training center | |||
Special Conquest | Non-poisonous, harmless and odorless | |||
Foundation/Base | Cement or asphalt | |||
Free Sample | Available | |||
Packaging Details | Liquid systems by using 25-300kg per steel barrel with wooden
pallet reinforcement. | |||
Delivery Detail | shipped in ten days after paid |
How long does a full PU running track typically last?
The lifespan of a full PU running track can vary depending on a
variety of factors, including the quality of the materials used,
the level of maintenance it receives, and the frequency and
intensity of use.
Generally speaking, a well-maintained full PU running track can
last anywhere from 8 to 12 years or more. However, it's important
to note that the track may require some repairs or resurfacing
during this time to ensure that it continues to perform at its
best.
Regular maintenance is key to extending the lifespan of a full PU
running track. This may include cleaning the surface regularly,
repairing any damage or cracks, and applying a protective coating
to prevent UV damage and other forms of wear and tear.
It's also important to note that the warranty offered by the
manufacturer can be an indicator of the expected lifespan of the
track. Some manufacturers offer warranties of up to 12 years or
more, which can provide some assurance that the track is built to
last.
Product features:
(1) Excellent anti-aging, ozone resistance, UV resistance and other
properties;
(2) High compactness, strong tensile resistance, good buffering
performance;
(3) high glue content, good overall performance;
(4) Suitable for concrete and asphalt foundation.
Quality requirements for runway foundation
Plastic runway construction is based on asphalt or cement, and the basic practice is roughly the same as road construction. The foundation surface requires good flatness, so as to ensure the consistency of the thickness of the plastic surface layer. The quality requirements for the plastic runway foundation are as follows.
(1) Slope: transverse < 1% (curve 8%, straight 5%, semi-circle
5%), longitudinal < 1%, jump area less than 0.4%, the surface
should be smooth, smooth drainage.
(2) flatness: flatness qualified rate of more than 95%, 3 meters straightedge measurement error is not more than 3㎜
(3) Positioning: In order to accurately construct and draw lines, the four semi-circular tangents and two circular centers of the runway site should be firmly and distinctly marked.
(4) Drainage: The drainage system must remove water two hours after
a heavy rain. In frozen areas, it is better to add a buffer layer
of geotextile between asphalt layer and gravel layer. Special
waterproofing should be done along the foundation of the drain
trench.
(5) Strength and stability: the foundation should have a certain
strength and stability, the surface is uniform and solid, smooth
without cracks, no rotten edge pile squeezing, no pockmarked
surface, smooth joints without obvious height difference. The
cushion is compacted with a density of more than 95%. After being
pressed by a medium roller, there are no significant tire marks and
loose float soil.
![]() |