Product Name | Full Pur Athletic Track | |||
Material | EPDM granules + PU Binder | |||
Color | Customized, Red, Blue | |||
Thickness: | 9-15mm (recommend 13mm) or customized | |||
Application | School, communities, stadium, training center | |||
Special Conquest | Non-poisonous, harmless and odorless | |||
Foundation/Base | Cement or asphalt | |||
Free Sample | Available | |||
Packaging Details | Liquid systems by using 25-300kg per steel barrel with wooden
pallet reinforcement. | |||
Delivery Detail | shipped in ten days after paid |
Product Superiority:
1. All-weather adaptable: It may be used in every climate,
regardless of the conditions of the weather or temperature.
2. High flexibility, cushioning, and shock absorption: Because of
the flooring's multi-layer construction and rubber granules, it was
soft and flexible, which could improve athletes' performance and
shield them from harm at the same time.
3. Anti-nail: even at the 100-meter beginning point, it won't be
damaged by spikes or start running frame.
4. Flatness: When installing a customized machine, you can alter it to make the thickness match the client's specifications.
5Weather resistance: It won't be damaged or faded by UV rays, ozone, or acid rain pollution, so the color will remain vibrant for a very long time.
Quality requirements for runway foundation
Plastic runway construction is based on asphalt or cement, and the basic practice is roughly the same as road construction. The foundation surface requires good flatness, so as to ensure the consistency of the thickness of the plastic surface layer. The quality requirements for the plastic runway foundation are as follows.
(1) Slope: transverse < 1% (curve 8%, straight 5%, semi-circle
5%), longitudinal < 1%, jump area less than 0.4%, the surface
should be smooth, smooth drainage.
(2) flatness: flatness qualified rate of more than 95%, 3 meters straightedge measurement error is not more than 3㎜
(3) Positioning: In order to accurately construct and draw lines, the four semi-circular tangents and two circular centers of the runway site should be firmly and distinctly marked.
(4) Drainage: The drainage system must remove water two hours after
a heavy rain. In frozen areas, it is better to add a buffer layer
of geotextile between asphalt layer and gravel layer. Special
waterproofing should be done along the foundation of the drain
trench.
(5) Strength and stability: the foundation should have a certain
strength and stability, the surface is uniform and solid, smooth
without cracks, no rotten edge pile squeezing, no pockmarked
surface, smooth joints without obvious height difference. The
cushion is compacted with a density of more than 95%. After being
pressed by a medium roller, there are no significant tire marks and
loose float soil.
![]() |